Water & Waste Water Case Study — Peel Common WWTW UK

Project:

Peel Common WWTW, Thames Water

Application Details:

Blower Enclosures and Inlet systems for waste water aeration

Supply Scope:

A series of acoustic packages for large blowers including ventilated acoustic enclosures to reduce breakout noise from blower casing and inlet filter silencers.

The enclosures were designed with integrated lockable access doors for maintenance and lift off roof panels for plant removal. The items supplied were complete with paint finish to WIMES Table 2 and a ventilation system was designed and supplied.

Product Selection and Performances:

The equipment was designed to reduce noise to 80dB(A) at 1m