Head office: +44 (0) 1924 418 940 Head office: +44 (0) 1924 418 940
Southern office: +44 (0) 203 143 5800 Southern office: +44 (0) 203 143 5800
EMAIL US
Contact Us
A CECO Environmental Brand
cecoenviro.com
Menu
  • Home
  • Products +
    • All Products
    • Acoustic Enclosures
    • Acoustic Containers
    • Acoustic Plant Screens
    • Acoustic Louvres
    • Noise Havens
    • Rectangular Splitter Attenuator
    • Acoustic Blankets & Materials
    • Circular Attenuator
    • Process Air Gas Silencers
    • Industrial Acoustic Doors
  • About Us +
    • Careers
    • History
  • Industries +
    • All Industries
    • Power Generation
    • Combined Heat and Power
    • Commercial
    • Data Centers
    • Oil & Gas
    • Petrochem
    • Waste Management & Recycling Noise Control Solutions
    • Food & Drink
    • Water & Waste Water
  • Services +
    • All Services
    • Industrial Noise Control
    • Acoustic Consultancy Services
    • Installation Services
    • Turnkey Solutions
  • Resource Centre +
    • News
    • Case Studies
    • Downloads
  • #10 (no title)
  • CECO Corporate

Our Case Studies

Home  |  Case Studies

Our Case Studies

United Utilities WWTW
Glazing Manufacturing, Blower Room
CHP Plant, London
Johan Sverdrup Oil Field, offshore Norway
Peel Common WWTW UK
Waste to Energy Plant, UK
Kursinayah FGD Plant, Saudi Arabia
Wasit Gas Plant
Mariner Oil Field, Offshore Norway
Ivar Assen Oil Field, Offshore Norway
Building products manufacturer, UK
Plastic Manufacturing Plant, UK
Page 3 of 4Previous Page01020304Next Page

Content © 2025 Wakefield Acoustics Ltd  |  Registered in England & Wales Company No. 1508543  |  Registered For Vat No. 334 5602 72

  • News
  • Contact Us
  • Newsletter Sign Up
  • Privacy Settings
  • Privacy Policy
  • Exercise Your Rights
  • Safe Contractor Approved
  • Building Confidence
  • 9001
  • 5001
  • 4001
  • Institute of Acoustics