Gas Peaking Plant, Essex, UK

Client Challenge:

A back-up power plant was to be located close to residential areas, presenting a potential noise nuisance.

Solution:

A large acoustic enclosure, complete with 6 individual engine bays and central switchgear room:

  • Noise restrictions: 55dBA at 10m noise requirements, achieved through acoustically insulated cladding panel design
  • Ventilation: Inlet and discharge ventilation for individual engine cells. Inlet removable for engine removal
  • Maintenance: Roof access ladder and walkway
  • Structural: structural calculations, and provision of internal support frame for full enclosure and roof mounted equipment

Outcome:

Compliance with project planning requirements and prevention of disturbance to nearby properties. Fully functional ventilated engine cells.